GREENWORLD SECTOR-7 // METRICS // VC-MET-408
ALL SYSTEMS NOMINAL ·
METRICS · CONTAINMENT & SAFETY

HEPA Filter Loading

VC-MET-408 — the loading of HEPA filtration stages as percent of pressure-drop budget — filter-life and bypass risk.

Metric ID VC-MET-408 Category Containment & Safety Unit % ΔP Type Direct Source PhytoSense Mesh Sampling 10 min Owner Metrology & Telemetry Standards Rev C · Effective 2089-06-01
Current 42 Nominal 0–60 10 min cadence PhytoSense Mesh

Definition

HEPA Filter Loading is the fraction of each HEPA stage's pressure-drop budget consumed (% ΔP), derived from across-filter differential pressure. It indicates remaining filter life and the risk of bypass or flow loss.

Why it matters

Loaded filters lose flow and, at the extreme, risk bypass that lets bioburden into corridors. Loading schedules filter changes before they constrain extract flow and undermine sphere differential.

Formula

Load = (ΔP_now − ΔP_clean) / (ΔP_max − ΔP_clean) × 100
           [% of budget]

ΔP measured across each stage; the most-loaded stage in a
train governs. 100 % = change-out threshold.

Inputs

InputDetailSource
Stage ΔPAcross-filter differentialPhytoSense Mesh
Clean baselineCommissioning ΔPCHLORA
FlowTrain volumetric flowPhytoSense Mesh

Units & Scale

% of ΔP budget, integer, governed by the most-loaded stage. Increasing-is-worse; upper thresholds apply.

Sampling & Source

Thresholds

Nominal · 0–60 % — ample filter life

OK

Warning · > 80 — schedule change-out

WARN

Critical · > 95 — flow-loss / bypass risk

CRIT

Upstream of containment. Filter loading is alarmed with sphere differential: a loaded train that begins to constrain extract flow will degrade ΔP, so a change-out is scheduled before loading reaches the critical band.

Recent Trend

Zone roll-up, last 14 sampling periods (current 42):

VC-MET-408 · 14-period trend (current 42)

Interpretation Guidance

BandReadingLikely DriverAction
0–60HealthyWithin service lifeNone.
61–80LoadingApproaching serviceSchedule change-out.
81–95WARNConstrained flowChange-out; watch ΔP.
> 95CRITBypass riskImmediate change-out; isolate train.

Related SOPs